#6 Week (Luciano)

May 7th 2018
  • Pontificia Univercidad Catolica
    • At the morning we meeting in the Domo to schedule our next steps and work  on our solutions.
    • WhatsApp Image 2018-05-13 at 23.51.50
    • Then, we went to a robotics workshop that was happening due the Innovation Week
    • WhatsApp Image 2018-05-22 at 06.10.25 (1)
      • After that to Coni’s class:
      • We watched the Mockups ( low cost prototypes ) presentation  in Dilab.

 

 

May 8th, Thuesday

We prepared our breakfast at Design Factory at DUOC San Joaquin. After that, we had a conversation to shared our process to Andrea, where we could show her our possible solutions and ask her about the presentation on Thursday.

Pitch

 

May 9th , Wednesday

Pontificia Universidad Católica

In the morning we had a meeting  the domo to discuss our new solutions and design the pitch presentation; after that we defined who would present and the storytelling.

In the afternoon, we had a workshop about reverse engineering for our project.

We deconstruct a VHS tape and a remote control.

REVERSE ENGINEERING (LEVI)

 

REVERSE ENGINEERING (LEVI) (1)

 

May 10th , Thuesday

We work remotly in the presentation to finished this .

Then we meet at IF Recoleta to organize the space where we would have the pitch session and to practice for one last time our presentation.

After the presentation, we had a conversation with our conterpart to show her our possibles solutions and to see her feedback about it.

WhatsApp Image 2018-05-10 at 19.06.19.jpeg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

Up ↑

%d bloggers like this: